All stone shall be placed to form a sediment and erosion control device, an instream structure, or a channel lining neatly and uniformly with an even surface in accordance with the contract and shall meet the approval of the Engineer. Measurement and Payment No. 57 Stone will be measured and paid as the actual number of tons (metric tons) that