The outlet is loed in such a way that water may flow to all the areas of a chak under gravity. Size of the outlet depends upon the command areas available in a chak for irrigation. After having fixed the canal alignment, detailed leveling is done along the alignment, and longitudinal section is plotted on a drawing sheet.