4. GE Saudi delivered and installed power generation products for the first Independent Power Plant (IPP). PP11, which was delivered ahead of scheduled time, has seven GE 7FA highefficiency gas turbines and two GE D11 steam turbines that support it. 1. 7 K + Megawatts is the capacity of PP11.