Dec 14, 2021 · Andean is now testing its ten million tonnes of material for economic grades of silver and tin at its fines disposable facility, he added. The mine has screened out fine material of less than millimetres in size since the mine's commissioning in 2008. Andean estimates the silver grade at this stockpile to be between 35 g/t and 40 g/t.