Debonding can cause early failure of a pavement, resulting in significant cracking and repair costs. Traditional paving techniques of a distributor spraying a small amount of tack in front of a paving operation, waiting for it to break, and then driving the entire paving process (several haul trucks, shuttle buggy, paver etc.) over the tack often results in a majority of the tack being .